Hera Tariq International

Bituminous Membrane Waterproofing

Professional bituminous membrane waterproofing solutions designed to protect roofs, foundations, basements and concrete structures from water penetration.

Request a Project Consultation
Our Expertise

Reliable Bituminous Waterproofing Solutions

Bituminous membrane waterproofing is a widely used system for protecting building structures against moisture and water ingress. These membranes are manufactured using modified bitumen and reinforcing materials to provide a protective waterproofing layer.

Hera Tariq International offers bituminous membrane waterproofing solutions selected according to project specifications, site conditions and the required protection system.

Talk to Our Team
Commercial building construction
Key Benefits

Why Choose Bituminous Membrane Waterproofing?

A properly selected and installed membrane system provides dependable protection for suitable building applications.

01

Water Resistance

Creates a protective barrier that helps prevent water penetration through concrete surfaces.

02

Strong Protection

Provides a robust waterproofing layer for suitable roofs and below-ground structures.

03

Flexible Performance

Modified bitumen membranes offer flexibility to accommodate certain movements.

04

Durability

Designed to provide long-term performance when installed and protected correctly.

05

Seam Protection

Overlapping and properly sealed joints help create a continuous waterproofing system.

06

Versatile Applications

Available in different membrane specifications for various construction requirements.

Building and construction project
Application Areas

Where Can Bituminous Membranes Be Used?

Bituminous membrane systems are suitable for several waterproofing applications, depending on the membrane type and project design.

  • Flat roofs and rooftop structures
  • Basements and underground walls
  • Building foundations
  • Podium decks and terraces
  • Concrete slabs and structural surfaces
  • Retaining walls
  • Selected infrastructure projects
Our Work Process

Bituminous Membrane Installation Process

Professional installation involves careful surface preparation, membrane placement and detailed joint treatment.

01

Site Inspection

Assessing the project area, surface condition and waterproofing requirements.

02

Surface Preparation

Cleaning and preparing the substrate to achieve a suitable installation surface.

03

Primer Application

Applying a compatible bituminous primer where required by the system specifications.

04

Membrane Installation

Installing membrane rolls using the specified application method and overlap details.

05

Joint Sealing

Sealing overlaps, edges and detailing to maintain continuity of the waterproofing layer.

06

Final Inspection

Checking the installed membrane before applying protection or covering layers.

Hera Tariq International

Need Professional Bituminous Waterproofing?

Contact our team to discuss your roof, basement or foundation waterproofing requirements in Jeddah and across Saudi Arabia.

Contact Us on WhatsApp